본문 바로가기

BIM 컨설팅 및 교육/Revit 2011 tutorial

tutorial-1_Step 11 Wall construction, wall wrapping, schedules, tag

Revit Architecture 2011 tutorial-1


.Step 11 Wall construction, wall wrapping, schedules, tag elements, section

Wall construction & wall joints

‐ change the wall construction

select an exterior wall

insert two layers

assign material and thickness

activate wall wrapping at inserts and at the ends

Tag elements

‐ tag doors

tag by category

click on a door

tag all

door tags – M_Door Tag

Schedules/quantities

‐ create schedule

view > schedules > schedule/quantities

category: doors

add fields: type, level, mark, height, width

‐ edit schedule

schedule properties > sorting/grouping

sort by: level

activate header and blank line

‐ changing the schedules

change elements through the schedule

Section

‐ create section

draw section Line

divide section line

edit the view range


Step11/14-Autodesk Revit Architecture 2011-English Tutorial1/3




Step 11 벽 건설, 벽 포장, 일람표, 태그 요소, 단면

Wall construction & wall joints

- 벽 구조 변경

외부 벽 선택

두 층 삽입

재료 및 두께 할당

벽의 시작과 끝에 포장 활성화

태그요소

‐ 문 태그

카테고리 별 태그

문 클릭

모든 태그

문 태그 – M_Door Tag

일람표 / 수량

‐ 일정 생성

view > schedules > schedule/quantities

카테고리 : 문

필드 추가 : type, level, mark, height, width

‐ 일정 편집

schedule properties > sorting/grouping

정렬 : 레벨 별

헤더와 공백을 활성화

‐ 일람표 변경

일람표에 따른 요소 변경

단면

‐ 단면 생성

단면선 그리기

단면선 분할 

뷰 범위 수정


반응형